Sorry I found no matches, Please try again. 176
vid = 1435pws_id = 352082pws_id = 352082
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.133.137.17 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Roos Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Roos Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Roos Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Yorkshire    
Type of installation: Wind    on/offshore: on
Turbines :9  Capacity : 17.1 MW
Approx Date of 1st power generation: April 2013

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

a nine turbine scheme situated in the East Riding of Yorkshire and capable of generating sufficient renewable electricity to meet the average needs of around 14,800 homes.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Roos Wind Farm Rectory Road Roos Hull HU12 0LA England

 Associated Companies.

Relationship Company (For: Roos )
DeveloperRenewable Energy Systems Ltd
OwnerRenewable Energy Systems Ltd

 DECC Data on this Project: Roos :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Roos Wind Farm (Resubmission)     17.1 MW
Energy Type: Wind Onshore
County: Humberside     Country: England     LPA: East Riding of Yorkshire Council
Site ID and Reference: 3835 / AA580     District:
Applicant: Renewable Energy Systems (RES)     Application : 08/05692/STPLFE (Go to search to find Application)
For Wind Farms  
Number of Turbines: 9 Turbine Capacity: 1.8999999999999999
Height of Turbines: Calculated capacity: 17.1
Site Address: Land To The West Of Ivy House Rectory Road Roos East Riding Of Yorkshire
 
County: Humberside Region: Yorkshire and Humber
OS Coordinates: 527376 / 527376
Development Status: Operational
Application Submitted: 1/20/2009 Planning Permission Granted
Application Determined: Permission refused: 8/11/2009
Construction Date: 3/1/2012    
Generator Live 4/2/2013 This Record Last Updated: 6/4/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 8/11/2009

 OFGEM Data on this Project: Roos: Wind :

Site Name: Roos Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00297RQEN
Capacity: 16818 Status: Live
Accreditation Date: 1/20/2009    
Commission Date: 12/6/2012    
Applicant: RES Ltd
Applicant Address: Beaufort Court Egg Farm Lane Kings Langley WD4 8LR England
Address: Roos Wind Farm Rectory Road Roos Hull HU12 0LA England

Site Name: Roos Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G02147NWEN
Capacity: 16818 Status: Live
Accreditation Date: 1/20/2009    
Commission Date: 12/6/2012    
Applicant: RES Ltd
Applicant Address: Beaufort Court Egg Farm Lane Kings Langley WD4 8LR England
Address: Roos Wind Farm Rectory Road Roos Hull HU12 0LA England
 
Assumptions: Capacity: 16818kW 16.818 MW,
Thus over the month Capacity * 720 hours per month = 12108.96 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 6169 36.68% Issued
01/02/2018 5583 33.20% Issued
01/01/2018 7354 43.73% Issued
01/12/2017 6703 39.86% Issued
01/11/2017 5996 35.65% Issued
01/10/2017 6970 41.44% Issued
01/09/2017 4104 24.40% Issued
01/08/2017 3680 21.88% Issued
01/07/2017 3458 20.56% Issued
01/06/2017 4552 27.07% Issued
01/05/2017 4584 27.26% Issued
01/04/2017 4243 25.23% Issued
01/03/2017 5211 30.98% Redeemed
01/02/2017 6249 37.16% Redeemed
01/01/2017 4740 28.18% Redeemed
Dec-16 04834 4834 28.74% Issued
Nov-16 04974 4974 29.58% Issued
Oct-16 04559 4559 27.11% Issued
Sep-16 04428 4428 26.33% Issued
Aug-16 04310 4310 25.63% Issued
Jul-16 03579 3579 21.28% Issued
Jun-16 02575 2593 15.42% Issued
Jun-16 02575 2593 15.42% Issued
May-16 04718 4718 28.05% Issued
Apr-16 04283 4283 25.47% Issued
Mar-16 04511 4511 26.82% Redeemed
Feb-16 06101 6101 36.28% Redeemed
Jan-16 07271 2925 17.39% Redeemed
Dec-15 09402 9402 55.90% Redeemed
Nov-15 07455 7455 44.33% Redeemed
Oct-15 04346 4346 25.84% Redeemed
Sep-15 02873 2887 17.17% Redeemed
Aug-15 03974 3974 23.63% Redeemed
Jul-15 33653365 3365 20.01% Redeemed
Jun-15 36383638 3638 21.63% Redeemed
May-15 55125512 5512 32.77% Redeemed
Apr-15 37383738 3738 22.23% Redeemed
Mar-15 66576658 6658 39.59% Redeemed
Feb-15 52235222 5222 31.05% Redeemed
Jan-15 80588059 8059 47.92% Redeemed
Dec-14 51645163 5163 30.70% Redeemed
Nov-14 48764876 29 0.17% Revoked
Oct-14 70297030 7030 41.80% Redeemed
Sep-14 16721654 1672 9.94% Redeemed
Aug-14 37753775 3775 22.45% Redeemed
Jul-14 30613061 3061 18.20% Redeemed
Jun-14 19611941 1961 11.66% Redeemed
May-14 38163817 3817 22.70% Redeemed
Apr-14 832820 831 4.94% Redeemed
Mar-14 60466046 6046 35.95% Redeemed
Feb-14 83398339 8339 49.58% Redeemed
Jan-14 74417441 7441 44.24% Redeemed
Dec-13 83288328 8328 49.52% Redeemed
Nov-13 50515050 5050 30.03% Redeemed
Oct-13 73557355 7355 43.73% Redeemed
Sep-13 41414141 1 0.01% Redeemed
Aug-13 37883789 3789 22.53% Redeemed
Jul-13 19671948 1967 11.70% Redeemed
Jun-13 26662652 2666 15.85% Redeemed
May-13 51455144 5144 30.59% Redeemed
Apr-13 53655365 5365 31.90% Redeemed
Mar-13 55135513 5513 32.78% Expired
Feb-13 37133714 3714 22.08% Expired
Jan-13 23282328 2328 13.84% Expired
Dec-12 617599 617 3.67% Expired

 Calculations


Capacity: 34.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 5/9/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 34.2 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352082

Project Info
©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School